Railway
C370-Construction Works for Taipa Border Gate Section of Macau LRT
source: Author: 2015-01-22 Date: 2020-01-08 Font size: [large medium small]


The total length of railway is 3075 meters, including 3 newly constructed stations and elevated viaduct in 4 range segments. Supporting facilities such as water supply and drainage systems, ventilation and air conditioning systems, electrical systems, fire systems, building renovation, landscaping, road embankment and pavement, etc..