Dredging & Reclamation
Lamma Power Station – Navigation Channel Improvement, Hong Kong
source: Author: 2015-01-22 Date: 2020-01-08 Font size: [large medium small]
This Project comprises of dredging of existing navigation channel leading to the HEC Lama Power Station Quay. Dredged level is -16.0m PD.
Previous: Chek Lap Kok Airport - Site Preparation, Hongkong, China.
Next: SAUDI RAS AZ ZAWR PORT EPC PROJECT
XML 地图 | Sitemap 地图