Marine Engineering
Damma Oil Terminal Project, Sudan
source: Author: 2015-01-22 Date: 2020-01-08 Font size: [large medium small]
 
 
Design and construction of -14.6 m oil terminal for 50000 DWT in the structure of boring pile pier foundation, construction of approach embankment with 756m.
Previous: Colombo South Container Terminal Project
Next: New Container Terminal & Dredging Project in Sudan Port
XML 地图 | Sitemap 地图