Maritime Works of PLTU 2 Jateng 1X660MW Adipala Project, Indonesia
source: Author: 2015-01-22 Date: 2020-01-08 Font size: [large medium small]
 


The project includes one 35000DWT coal import jetty (234m×25m), two rock hearting with concrete block armour breakwaters , total length is 2105m, dredging quantity is about 2,260,000m3, 431 m long revetment, one water intake, coal transport belt conveyor system.