Marine Engineering
Jetty Works of PLTU 3 JAWA TIMUR(2×350MW)TANJUNG AWAR-AWAR
source: Author: 2015-01-22 Date: 2020-01-08 Font size: [large medium small]
 

The project includes one 12000DWT Gravity caisson coal import jetty (193m×25m), two rock hearting with concrete block armour breakwaters arranged as an encircled ring and total length is2359m,dredging quantity is about 1,500,000m3, 930m long revetment, one water intake.
 