Marine Engineering
GRN, Port of Lobito Extension Project Container Terminal
source: Author: 2015-01-22 Date: 2020-01-08 Font size: [large medium small]
 
 
Extension Work--Container Terminal is located in Lobito, Angola. The length is 414 meters. Container Terminal includes 621 steel pipe piles, and the superstructure is cast-in-situ composite board. Except the marine work, Container Terminal also contains (1)Dredging; (2)Stackyard; (3) Handling Technology; (4) Water supply, lighting installation, drainage, communication and navigation facilities; (5)Dry Port; (6) Bridge; (7)VTS; (8)Tugboat.
Previous: Grn, Port of Lobito Extension Project Mineral Terminal
Next: Yangshan Deep Water Port, Phase I, China