2012
Foundation Ceremony was Held for Phase I Container Terminal Project of Dammam Port of Saudi Arabia
source: Author: Date: 2012-10-22 Font size: [large medium small]

October 6, 2012 witnessed the grand foundation ceremony of Phase I SGP Container Terminal Project of King Abdullah Bin Abdulaziz Port (Dammam Port) of Saudi Arabia undertaken by the Company.

The Project is jointly invested by Saudi Arabia Public Investment Fund and the Singapore Port Authority. The Company is EPC general contractor of the Project. Two container berths will be constructed and the total length will be 600 meters. The contractual construction period is 800 days. After completion of the Project, annual transportation volume can reach 900,000 TEUs. The Project will vigorously promote economic development of Saudi Arabia.

Previous: CHEC Won the Bid for Conakry Container Wharf Expansion Project of Guinea
Next: China Harbour Signed an EPC Contract for Phase I Causeway in Indonesia
XML 地图 | Sitemap 地图